Onboarding checklist
Every blank app goes through the same six steps: add a page, put a component on it, create data, bind the component to that data, preview, publish. The onboarding checklist in the builder tracks these six steps for a new app and ticks them off as you complete them; you can dismis
Every blank app goes through the same six steps: add a page, put a component on it, create data, bind the component to that data, preview, publish. The onboarding checklist in the builder tracks these six steps for a new app and ticks them off as you complete them; you can dismiss it at any time and come back here for the details. This page explains what each step means and exactly where to do it.
When to use
Use the checklist for your first app, or as a reminder of the minimum path to a published app when you start from a blank project.
The six steps
| # | Step | Where | Done when |
|---|---|---|---|
| 1 | Add a page | Build → Pages → New | The app has a page besides the home page, or the home page has a purpose |
| 2 | Add a component | Build → Components → drag onto the canvas | At least one component is on a page |
| 3 | Create data | Data → New entity | An entity with fields exists |
| 4 | Bind data | Inspector → Data tab | A component reads from an entity |
| 5 | Preview | Preview in the top bar | You have opened the preview |
| 6 | Publish | Publish in the top bar | A production or staging deployment exists |
Step 1: add a page
Open the Pages tab in the left panel and click New. Give the page a name, pick its type (standard, dynamic, modal or drawer), choose who can open it and, optionally, a starter such as Customer list or Booking form. New standard pages appear in the app menu automatically. See Page types.
Step 2: add a component
Open Components, search or browse the categories, then drag a component onto the canvas or click it to add it to the selected container. Business components such as Customers or Job Manager are complete building blocks and also take care of step 3. See Canvas.
Step 3: create data
Open Data and click New entity. Start from a template (Customers, Jobs, Invoices, Products, Bookings, Tasks and more) or start blank with your own fields. Then add a few records on the Records tab, or generate sample records so your pages have something to show. See Entities.
Step 4: bind data
Select the component, open the Data tab in the inspector and set Source → Database, then choose the entity. Add filters, sorting and a limit if needed. For single values, click the ⚡ icon next to any bindable property to make it dynamic and pick from the data picker. See Bindings.
Step 5: preview
Click Preview. Check the page on desktop, tablet and mobile, and switch Preview as to the roles your app uses. The preview uses your draft and test data. See the Preview overview.
Step 6: publish
Click Publish, choose Production or Staging preview, read the checklist and publish. The dialog then shows your live link. See Publish.
Business apps: "Make this app yours"
When your app started from a library app (a starter such as Inventory Control or Work Order Manager) or from an app you built on the start page and then saved to your account, the checklist shows a different list. These apps already have pages, data and workflows, so the steps are about making them work for you and getting them ready to go live. Each step is ticked from what has actually happened in your project — clicking the step only takes you to the right place.
| Step | Where | Done when |
|---|---|---|
| Run your first workflow in Preview | Preview → submit a form or press an action button | A workflow ran successfully on test data |
| Customize a page, field or rule | Build, Data or Logic | You (or the AI) changed the app after it was created |
| Invite a teammate to preview | Users → Builder team | Someone else is in the workspace, or an invite is pending |
| Run the business tests | Tests | A test suite passed (after a failure the step reads "Fix and re-run") |
| Check release readiness | Publish → readiness report | You opened the production readiness report |
| Connect production data (optional) | Data → database | A production database is connected. Without one, the built-in database is used |
| Publish when your plan allows | Publish | The app is live. During the trial this step stays locked: building and previewing are included, publishing needs a paid plan |
The business tests run on a throw-away copy of your app — no real records are touched and no email is sent. See Business tests and Readiness report.
Dismissing the checklist
The checklist is a helper for new apps only. Dismiss it when you no longer need it; the six steps stay documented here, and the publish checklist (which validates the app itself) is separate and always runs when you publish.
Common mistakes
- Skipping step 4. A table without a data binding shows nothing; the publish checklist also warns about data components that are not connected.
- Previewing only as Owner. Owners see everything. Preview as the roles your users will have.
- Publishing before adding a home page. The home page is required; a blank app already has one.